Title: Analisis Kelayakan Proyek Pengembangan Sistem Informasi Manajemen Menggunakan Metode Cost and Benefits Analysis (Studi Kasus : Sebuah Distributor di Semarang)
Authors: Maria, Evi
Keywords: cost and benefit variable;management information system;payback period;net present value;return of investment;internal rate and return
Issue Date: Feb-2010
Publisher: Fakultas Teknologi Informasi Universitas Kristen Satya Wacana
Abstract: This research describes how to calculate the feasibility of Management Information System Project in economic perspectives, in the cost and benefits analysis. This research used fmancia1 tools such as Payback Period, NPV, ROI, and IRR. Before using the tools, we must identify about the components which can be used as calculation variables of the project. This research also discusses about difficulties of identified benefits and how to calculate it, especially the intangible benefits. The calculation is performed using Microsoft Excel 2007
Description: aiti : Jurnal Teknologi Informasi Vol. 7, No. 1, Februari 2010, p. 30-37
URI: http://repository.uksw.edu/handle/123456789/51
ISSN: 1693-8348
Appears in Collections:Aiti 2010 Vol. 7 No. 1 Februari

Files in This Item:
File Description SizeFormat 
ART_Evi Maria_Analisis kelayakan proyek_Abstrak.pdfAbstract54.54 kBAdobe PDFView/Open
ART_Evi Maria_Analisis kelayakan proyek_Full text.pdfFull text328.07 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.